|
Power Train |
|
|
Engine |
Caterpillar C-6.6 Tier III Diesel |
|
Rating |
174 HP (130 kW) |
|
Fuel Capacity |
40 U.S. Gallons (151 L) |
|
Hydraulic Capacity |
80 U.S. Gallons (303 L) |
|
Battery |
(1) Deka 94DLT 12 V, 860 CCA |
|
Noise Rating |
78 dB(A) |
|
Carriage System |
|
|
Carriage System |
Rack and Pinion, (4) Pinion Drive with Adjustable Force Limiter |
|
Maximum Thrust/Pullback |
60,000 lbs (27 Tonnes) |
|
Maximum Carriage Speed |
65 ft. (19.8 m)/minute |
|
Minimum Carriage Speed |
32 ft. (9.8 m)/minute |
|
Rotary Drive |
|
|
Rotary Drive |
(2) Pinion and Gear Drive with Infinitely Variable Torque |
|
Maximum Rotary Torque |
10,000 ft-lbs. (13,558 Nm) @ 50 RPM |
|
Minimum Rotary Torque |
4,500 ft-lbs. (6,101 Nm) @ 110 RPM |
|
Maximum Rotary Speed |
110 RPM |
|
Rotary Motor |
(2) Hydraulic LSHT 40.6 CIR |
|
Fluid Course |
2 in. (50 mm) |
|
Maximum Flow |
250 U.S. Gallons (946 L)/minute flow |
|
Maximum Pressure |
3,500 psi (241 bar) |
|
Misc. |
Wireline Commutator, Slip Ring, Side Entry Sub |
|
Wrench |
|
|
Wrench Design |
Open-Top Style |
|
Clamp/Grip Range |
1 3/8 in. – 4 1/8 in. (35 - 105 mm) |
|
Fixed Hydraulic Cylinder |
(2) 6 in. Bore x 4 in. Stroke (152.4 - 102 mm) |
|
Rotational Hydraulic Cylinder |
(2) 6 in. Bore x 4 in. Stroke (152.4 - 102 mm) |
|
Breakout Hydraulic Cylinder |
(1) 3.5 in. Bore x 4.47 in. Stroke (89 - 114 mm) |
|
Drilling Fluid Pump |
|
|
Pump |
Triplex |
|
Maximum Flow |
130 U.S. Gallons (492 L)/minute |
|
Maximum Pressure |
1,500 psi (103 bar) |
|
Working Range |
|
|
Drill Angle |
12° - 26° |
|
Crane |
|
|
Lift Rating |
6,000 lbs. (2,722 kg) |
|
Additional Information |
- Remote Control Operating Pendant
- Hydraulically Extended Boom
- Winch and Slewing Drive
- High Torque Hydraulic Motors
- Anti-Two Blocking Device
|
|
Boom Length |
10 ft.10 in. (3.3 m) |
|
Pipe Loader |
|
|
Maximum Pipe Basket Capacity |
(9) Pieces of 15 ft. (4.57 m) Drill Pipe |
|
Total Drill Pipe Length 9 (per basket) |
135 ft. (41 m) |
|
Maximum Pipe Baskets (Working) |
(2) for 270 ft. (82 m) of Drill Pipe |
|
Maximum Pipe Baskets (Transport) |
(1) |
|
Drill Pipe in Staging Area (Excludes Pipe Basket Total) |
(3) Pieces of 15 ft. (4.57 m) Drill Pipe |
|
Total Working Drill Pipe |
315 ft. (96 m) |
|
Drill Pipe |
|
|
Length |
15 ft. (4.57 m) |
|
Outside Tube Diameter |
3 ½ in. (89 mm) |
|
Tool Joint Outside Diameter |
4 1/8 in. (105 mm) |
|
Thread Type |
2 7/8 in. (73 mm) IF Pin x Box |
|
Water Course |
1 ¾ in. (44 mm) |
|
Weight |
222 lbs. (101 kg) each |
|
Drill Rig Mounting |
|
|
Travel System |
Self-Propelled on Track Crawler Assembly |
|
Track Material |
Polyurethane Rubber |
|
Maximum Flat Surface Travel Speed |
2.25 mph (3.62 km/h) Forward and Reverse |
|
Ground Bearing Pressure |
8.7 psi (0.6 bar) |
|
Auger Stake Down System |
|
|
Auger Stake Down |
(4) H-Beam Stake Rotational Screws |
|
Stake Down Motor |
(2) Hydraulic, LSHT, 24 CIR |
|
Stake Down Gearbox |
(2) Planetary Drives |
|
Stake Down Hydraulic Cylinder |
(2) 2 in. Bore x 24 in. Stroke (51 - 610 mm) |
|
Stake Down Size |
6 in. (152.4 mm) Diameter |
|
Safety |
|
|
Safety Features |
- Es!Lok – Exit Side Lockout System
- Zap-Alert Electrical Detection Device
- Emergency Shutdown Switch at Operators Console
- Electrical Grounding Rods
- Safety Mats
|
|
Weight |
|
|
Drill Rig Weight (w/o) Drill Pipe |
22,250 lbs. (10,090 kg) |
|
Drill Rig Weight (Transport)
*Recommended (1) for Pipe Basket (9) Pieces of Drill Pipe + (3) Pieces of Drill Pipe from Staging Area |
24,915 lbs. (11,301 kg) |
|
Drill Rig Weight (Working)
(2) Pipe Baskets for (18) Pieces of Drill Pipe + (3) Pieces of Drill Pipe from Staging Area |
26,916 lbs. (12,209 kg) |
|
Dimensions |
|
|
Length |
25 ft. (7.62 m) |
|
Width |
8 ft. 2 in. (2.48 m) |
|
Track Width |
7 ft. 5 in. (2.29 m) |
|
Height |
9 ft. 4 in. (2.84 m)
|